Fortum’s Loviisa nuclear power plant had a successful production year in 2015. A total of 8.47 terawatt hours of power was generated, corresponding to about 13 per cent of total energy generation in Finland.

On an international scale, the 92.9% load factor of the Loviisa nuclear power plant was among the best in the world for pressurised water reactor power plants. Loviisa unit 1’s load factor was 92.7% and Loviisa unit 2’s 93.1%. Loviisa 1’s production output was the fourth highest in the history of the plant.


 Unplanned automatic scrams per 7000 hours critical (UA7)

​2013 2012​ 2011​
Loviisa 1​ 0 ​0 0
​Loviisa 2 ​0 ​0 ​0

 

The International Nuclear and Radiological Event Scale (INES) incidents at the Loviisa power plant

​2013 2012​ 2011​
Loviisa 1​ 0 ​2 (INES 1) 0
​Loviisa 2 ​2 (INES 1) 1 (INES 1) ​0

 