Göteborg Energi power plants, Sweden, full scope Ecotuning® project 2009–2010

Fortum Ecotuning® finds the weak links in your operational economy, no matter if it is the latest CCGT or old conventional power plant.

GÖTEBORG Energi 2
Göteborg Energi power plants Details
Rya KKV 3 GT+ST
Rya heat pump plant 2x50 & 2x25 MW
Sävenäs 1 of 3 large HOBs
Rosenlund 2 steam boilers, 2 ST, 3 HOB
Location Gothenburg, Sweden
Customer Göteborg Energi AB
Project duration 2009-2010
Services Full scope Ecotuning® project

Description of the project

Ecotuning® project’s target was to reduce plant annual fuel consumption by 1% without any major investments. Any proposed investment payback time should be less than four years. Also the target in this project was to keep or even increase power production while keeping the heat production unchanged.

Power plants were modelled by using Fortum’s own power plant simulator (Solvo®). This ensured accurate calculation for each improvement impact on plant performance. List of improvements were established in co-operation with the customer. Each item profitability was calculated including action plan for implementation.

Customer benefits:

Findings and investments:

  • Total number of improvements proposed: 12 (7 without any investment)

Investments required:

  • totally > 500 k€

Payback time for investments:

  • All savings below 2 a

Calculated savings for the customer:

  • Calculated savings totally > 500 k€/a
  • Savings without investments > 200 k€/a

”We selected Fortum as our partner to analyse and improve our own power plants’ performance. Fortum has expertise which supplements our own experience and excellent product - Fortum Ecotuning®.

 

 

Manager Lena Lilienberg, Göteborg Energi, Sweden

Contact

Ilkka Salmensaari
Product Manager
Tel: +358 50 453 4876
[email protected]