FORTUM CORPORATION PRESS RELEASE 4 January 2016
Fortum’s Loviisa nuclear power plant had a successful production year in 2015. A total of 8.47 terawatt hours of power was generated, corresponding to about 13 per cent of total energy generation in Finland. On an international scale, the 92.9% load factor of the Loviisa nuclear power plant was among the best in the world for pressurised water reactor power plants. Loviisa unit 1’s load factor was 92.7% and Loviisa unit 2’s 93.1%. Loviisa 1’s production output was the fourth highest in the history of the plant.